Delhi Building collapse

‘Owners failed to take safety precautions’: Delhi Police to HC on Satya Niketan building collapse

‘Owners failed to take safety precautions’: Delhi Police to HC on Satya Niketan building collapse

Delhi Police told the HC that six accused failed to take safety measures during repair work, causing the Satya Niketan…

September 24, 2026

Satya Niketan shadow hangs over DUSU polls as students seek safer, affordable PGs

Safety and rent concerns dominate DUSU polls as DU students demand safer, regulated PGs and Metro concessions following Satya Niketan…

September 18, 2026

Delhi govt to develop hostels for 10,000 students, land identified: CM Rekha Gupta

The decision by the Delhi government comes in the aftermath of the collapse of a five-storeyed PG accommodation in Satya…

September 15, 2026

Delhi: MCD plans action against visibly dangerous buildings

After the Satya Niketan collapse, MCD cracked down on unsafe PGs, executing 40 demolitions and sealing 8 properties in a…

September 16, 2026

Delhi building collapse: HC refuses urgent listing of plea over demolition of adjoining structure

Delhi HC refuses urgent listing of plea over MCD demolition of building adjoining collapsed Satya Niketan hostel, questions basis of…

September 14, 2026

Evacuation in 4-storey Delhi building after sudden tilt

A police team reached the spot soon after receiving information about the incident and cordoned off the area as a…

September 13, 2026

Delhi: MCD intensifies demolition, sealing drive against illegal constructions

MCD intensifies crackdown on illegal buildings across Delhi, with demolition and sealing drives continuing in several areas

September 11, 2026

On day 10 of protest, Shahpur Jat residents seek rollback of waste facility proposal, written assurance

The land is proposed to be used for parking waste collection vehicles, storing equipment, maintenance and other operational requirements

September 11, 2026

Delhi building collapse: Police seek 3-day custody of owner’s son, PG operator, building contractor

The proceedings were held in-camera after Sudhanshu's counsel claimed that "a media trial" was prejudicing the ongoing probe

September 9, 2026