Delhi NCR

Delhi airport’s runway RW 28/10 resumes operations after maintenance pause

Published by
Patriot Bureau

Indira Gandhi International Airport (IGIA) Delhi resumed operations on runway RW 28/10 on Tuesday, following a temporary closure for maintenance. The reopening is expected to alleviate air traffic congestion at the busy airport.

Initially, the runway was scheduled to remain closed for an extended period to facilitate the upgrade of its Instrument Landing System (ILS) at one end, in preparation for the upcoming fog season. However, the closure, compounded by easterly winds, led to disruptions in flight operations. To address this, maintenance work has been temporarily halted, with the project set to resume in mid-June.

“Following the approved plan with all stakeholders, Delhi airport handed over RW 28/10 to the Air Traffic Control (ATC) at 8:04 am today. Operations will continue until mid-June,” Delhi International Airport Limited (DIAL) confirmed in a post on X. The temporary reopening is expected to improve the flow of arrivals and departures, particularly with the ongoing unpredictable wind conditions.

The runway had originally closed on April 8 for the ILS upgrade. As one of the country’s busiest airports, IGIA handles approximately 1,300 flights daily, with four runways and two operational terminals, T1 and T3. Terminal T2 is currently closed for maintenance.

Also Read: Sanctuary from scorching summer: Inside Delhi’s recovery shelters

Runways are typically numbered at both ends, indicating the directions for aircraft landings and departures. RW 28/10 is sometimes referred to as RW 10/28 due to this dual designation.

DIAL announced that the runway will be closed again from mid-June to mid-September 2025, after the peak tourist season, when winds are expected to shift. The airport operator reassured passengers that it is working closely with airlines and stakeholders to minimise disruptions.

In light of recent flight delays and congestion, Civil Aviation Minister K. Rammohan Naidu assured the public on April 28 that the ministry was closely monitoring the situation at Delhi airport. “We are overseeing every aspect of operations and have guided the airport authorities to ensure better planning moving forward,” he said, addressing concerns that the timing of the runway maintenance could have been better coordinated.

(With inputs from PTI)

Patriot Bureau

Published by
Patriot Bureau
Tags: delhi

Recent Posts

Delhi consumer commission orders bank to pay Rs 49,600 over failed Rs 10,000 ATM transaction

Bank ordered to refund Rs 10,000 and pay Rs 39,600 compensation and costs for failed…

September 10, 2026

‘Kala Hiran’ movie not in releasable form, makers tell Delhi HC in Salman Khan’s suit

Salman Khan’s ‘Kala Hiran’ suit: Delhi HC told the film is not ready for release…

September 10, 2026

KNMA opens two exhibitions exploring abstraction, ecology

KNMA’s two exhibitions bring together abstract art and ecological themes, examining geometry, plant life, memory,…

September 10, 2026

Delhi HC bars GST registration without biometric-based Aadhaar authentication

Delhi HC mandates biometric Aadhaar for GST registration amid rising fraud and misuse of PAN-Aadhaar…

September 10, 2026

Five held for duping Delhi man in credit card fraud, fake website unearthed

Five arrested for posing as bank officials, duping Delhi resident of ₹31,663 through fake credit-limit…

September 10, 2026

Delhi: 56 jewellery shops sealed in Chandni Chowk; traders say gold, silver worth crores locked

According to traders, the notices affixed to the shops are backdated, with one notice shared…

September 10, 2026